Non-Compliance detail


  
Summary
 
Licence number: 2647
Annual Return Start: 01 Jan 2015
Annual Return End: 31 Dec 2015
Date Received: 26 Feb 2016
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L2.1 The Total Suspended Solids load discharged from the premises was greater than the load limit. STP underwent upgrades to multiple trickling features which impacted on the plants availability to reduce suspended solids Administrative non-compliance - licensee advised of required action 1
M2.1 The required sampling frequency was not maintained due to safety considerations caused by severe weather conditions & scheduling error Administrative non-compliance - licensee advised of required action 1
L2.2 Chromium,pesticides & PCB loads not calculated in accordance with the load calculation protocol due to the discrepancy in monitoring required in the licence & the load calculation protocol. Sampling schedule modified for 2016 to prevent recurrence Administrative non-compliance - licensee advised of required action 1